{
  "contentStorage": "postgres",
  "title": "Changchun Metro Line 6 · Relations",
  "description": "Changchun Metro Line 6 is a rail transit line connecting the east and west of southern Changchun. It opened on 28 March 2024.",
  "url": "/en/concepts/changchun-metro-line-6/relation.html",
  "entity": {
    "customFields": [
      {
        "key": "line_opened",
        "value": "28 March 2024"
      },
      {
        "key": "line_length",
        "value": "29.57 km (2024 project figures)"
      },
      {
        "key": "line_stations",
        "value": "22 (at the opening in 2024)"
      },
      {
        "key": "line_termini",
        "value": "Shuangfeng Station — Changying Century City Station"
      },
      {
        "key": "line_structure",
        "value": "Underground"
      },
      {
        "key": "line_status",
        "value": "In operation"
      }
    ],
    "id": "concept_changchun_metro_line_6",
    "type": "concept",
    "title": "Changchun Metro Line 6",
    "slug": "changchun-metro-line-6",
    "aliases": [
      "长春轨道交通6号线"
    ],
    "summary": "Changchun Metro Line 6 is a rail transit line connecting the east and west of southern Changchun. It opened on 28 March 2024.",
    "status": "published",
    "categories": [
      "category-transit",
      "category-urban-rail"
    ],
    "tags": [
      "tag-metro",
      "tag-metro-line"
    ],
    "sources": [
      {
        "id": "cscec-opening-2024",
        "title": "中国建筑：中建三局参建的长春轨道交通6号线工程正式通车",
        "date": "2024-04-03",
        "url": "https://www.cscec.com.cn/xwzx_new/zqydt_new/202404/3768282.html",
        "locator": "中建三局供稿，记载2024年3月28日通车、工程长度和车站数。"
      },
      {
        "id": "jilin-20240329",
        "title": "吉林省人民政府：长春轨道交通6号线开通运营",
        "date": "2024-03-29",
        "url": "https://www.jl.gov.cn/yaowen/202403/t20240329_3130359.html",
        "locator": "记载线路走向、开通、地下车站和换乘站。"
      },
      {
        "id": "changchun-summer-2026",
        "title": "中国吉林网转载：长春轨道交通夏季运营时间",
        "date": "2026-04-28",
        "url": "https://news.cnjiwang.com/jlxwdt/sn/202604/4042042.html",
        "locator": "文章标注来源长春发布、长春轨道交通；2026年4月30日至10月31日夏季首末班。"
      },
      {
        "id": "changchun-jlnews-times-20260928",
        "title": "中国吉林网：含5号线！收好这份长春轨道交通各线路首末班及换乘时间表",
        "date": "2026-09-28",
        "url": "https://news.cnjiwang.com/jwyc/202609/4085559.html",
        "locator": "记者许一鸣；图表注明来源长春轨道交通集团，6号线各站双向首末班。"
      }
    ],
    "createdAt": "2026-10-29T11:57:44+08:00",
    "updatedAt": "2026-10-29T17:35:49+08:00",
    "updatedBy": "user:admin",
    "revision": 7,
    "body": "## Overview\n\nChangchun Rail Transit Line 6 is an east–west line connecting the south of the city, running from Shuangfeng Station in the west to Changying Century City Station in the east and passing through Changchun Western New City, Southern New City and Jingyue High-tech Zone. The Jilin provincial government website records that the line opened for operation on 28 March 2024, with 22 underground stations at the opening.[^jilin-20240329]\n\nChina State Construction, one of the construction participants, records the project as 29.57 km long; the provincial government website reports about 29.6 km.[^cscec-opening-2024] [^jilin-20240329]\n\n## Stations\n\nThe following is arranged from Shuangfeng to Changying Century City according to the operator timetable republished in September 2026; listing a station does not by itself prove its current open status[^changchun-jlnews-times-20260928]:\n\n- Shuangfeng\n- Changchun West\n- Tengyuejie\n- Zhinong Dajie\n- Feiyue Square\n- Eurasia Shopping Mall\n- Guanggu Dajie\n- Silicon Valley Square\n- Baihuayuan\n- Municipal Court\n- Lanraohu Park\n- Rail Transit Group\n- Xinmingjie\n- Huaqinglu\n- Nanxi Wetland Park\n- Fuzhi Dalu\n- Wujiadian\n- Yatai Football Base\n- Yinghuajie\n- Juye Dajie\n- Provincial Museum\n- Changying Century City\n\n## Stations and interchanges\n\nThe existing-line interchange stations listed in the opening report on the provincial government website include: Shuangfeng Station and Changchun West Station (Line 2), Huaqinglu Station (Line 1), Fuzhi Dalu Station (Line 4) and Changying Century City Station (Line 3). The above is the interchange information given in the opening report; subsequent changes in interchange arrangements are subject to operator announcements.[^jilin-20240329]\n\n## Operating hours and first/last trains\n\nInformation dated 28 April 2026 from Changchun Rail Transit, republished by China Jilin Net, published the summer first and last train times for 30 April to 31 October 2026:[^changchun-summer-2026]\n\n| Direction | First train | Last train |\n| --- | --- | --- |\n| Shuangfeng to Changying Century City | 05:15 | 22:35 |\n| Changying Century City to Shuangfeng | 05:35 | 22:35 |\n\nThis is the line-direction timetable given in the announcement, not a station-by-station two-way table; in the event of subsequent working timetables or temporary adjustments, operator announcements prevail, and the summer times cannot simply be carried over beyond 31 October.\n\n## Station-by-station first/last trains published in 2026\n\nOn 28 September 2026, China Jilin Net republished the two-way timetable diagram provided by Changchun Rail Transit Group. In the report, summer is 1 May to 31 October and winter is 1 November to 30 April of the following year; the summer and winter last-train columns in the table excerpt the values for the two seasons respectively, while the first-train diagram does not distinguish seasons. Some first trains at intermediate stations are not through workings of the terminus first train and cannot be derived by calculation. Subsequent working timetables and special days may bring adjustments; operator announcements and in-station information prevail.[^changchun-jlnews-times-20260928]\n\n| Station | First towards Changying Century City | Last towards Changying Century City (summer) | Last towards Changying Century City (winter) | First towards Shuangfeng | Last towards Shuangfeng (summer) | Last towards Shuangfeng (winter) |\n| --- | --- | --- | --- | --- | --- | --- |\n| Shuangfeng | 05:15 | 22:35 | 22:05 | — | — | — |\n| Changchun West | 05:16 | 22:36 | 22:06 | 05:55 | 23:19 | 22:49 |\n| Tengyuejie | 05:19 | 22:39 | 22:09 | 05:52 | 23:16 | 22:46 |\n| Zhinong Dajie | 05:21 | 22:41 | 22:11 | 05:50 | 23:14 | 22:44 |\n| Feiyue Square | 05:23 | 22:43 | 22:13 | 05:47 | 23:12 | 22:42 |\n| Eurasia Shopping Mall | 05:26 | 22:46 | 22:16 | 05:45 | 23:10 | 22:40 |\n| Guanggu Dajie | 05:28 | 22:48 | 22:18 | 05:43 | 23:08 | 22:38 |\n| Silicon Valley Square | 05:30 | 22:50 | 22:20 | 05:41 | 23:06 | 22:36 |\n| Baihuayuan | 05:32 | 22:52 | 22:22 | 05:38 | 23:03 | 22:33 |\n| Municipal Court | 05:34 | 22:54 | 22:24 | 05:37 | 23:01 | 22:31 |\n| Lanraohu Park | 05:37 | 22:57 | 22:27 | 05:35 | 22:59 | 22:29 |\n| Rail Transit Group | 05:38 | 22:58 | 22:28 | 05:41 | 22:57 | 22:27 |\n| Xinmingjie | 05:40 | 23:00 | 22:30 | 05:39 | 22:56 | 22:26 |\n| Huaqinglu | 05:42 | 23:02 | 22:32 | 05:37 | 22:53 | 22:23 |\n| Nanxi Wetland Park | 05:45 | 23:05 | 22:35 | 05:35 | 22:50 | 22:20 |\n| Fuzhi Dalu | 05:18 | 23:08 | 22:38 | 05:47 | 22:47 | 22:17 |\n| Wujiadian | 05:21 | 23:11 | 22:41 | 05:45 | 22:45 | 22:15 |\n| Yatai Football Base | 05:23 | 23:13 | 22:43 | 05:42 | 22:42 | 22:12 |\n| Yinghuajie | 05:25 | 23:15 | 22:45 | 05:40 | 22:40 | 22:10 |\n| Juye Dajie | 05:27 | 23:17 | 22:47 | 05:38 | 22:38 | 22:08 |\n| Provincial Museum | 05:29 | 23:19 | 22:49 | 05:36 | 22:36 | 22:06 |\n| Changying Century City | — | — | — | 05:35 | 22:35 | 22:05 |\n\nThe diagram also gives values in the terminus direction; this table marks them with \"—\" and does not treat them as boarding departure times in that terminus direction; listing a station also does not by itself prove its current open status.",
    "url": "/concepts/changchun-metro-line-6.html",
    "lang": "en",
    "sourceLang": "zh",
    "availableLangs": [
      "zh",
      "en"
    ],
    "conceptKind": "metro_line"
  },
  "entities": null,
  "mentions": [
    {
      "fromId": "place_changchun_huaqinglu",
      "fromTitle": "Huaqing Rd. station",
      "fromUrl": "/en/places/changchun-huaqinglu.html",
      "fromType": "place"
    }
  ],
  "lang": "en",
  "availableLangs": [
    "zh",
    "en"
  ],
  "infoFields": [
    {
      "key": "concept_kind",
      "label": "Concept kind",
      "value": "Metro line"
    },
    {
      "key": "aliases",
      "label": "Aliases",
      "value": "长春轨道交通6号线"
    },
    {
      "key": "line_opened",
      "label": "Opened",
      "value": "28 March 2024"
    },
    {
      "key": "line_length",
      "label": "Length",
      "value": "29.57 km (2024 project figures)"
    },
    {
      "key": "line_stations",
      "label": "Stations",
      "value": "22 (at the opening in 2024)"
    },
    {
      "key": "line_termini",
      "label": "Termini",
      "value": "Shuangfeng Station — Changying Century City Station"
    },
    {
      "key": "line_structure",
      "label": "Structure",
      "value": "Underground"
    },
    {
      "key": "line_status",
      "label": "Status",
      "value": "In operation"
    }
  ],
  "pagination": {
    "page": 1,
    "pageSize": 50,
    "total": 0,
    "pageCount": 0
  },
  "mentionsTotal": 1
}