<?xml version="1.0" encoding="UTF-8"?>
<page>
  <sourceCitations></sourceCitations>
  <contentStorage>postgres</contentStorage>
  <sameNames></sameNames>
  <basedOn></basedOn>
  <title>Hangzhou Metro Line 15 · Versions</title>
  <description>The first phase of Hangzhou Metro Line 15 is an under-construction north–south underground line from Yatai Road station in Xiaoshan District to Chongxian station in Linping District. It is about 40.9 km long, with 30 stations, including 15 interchange stations. Reports in October 2026 cited a target of being ready for service by the end of 2027.</description>
  <url>/en/concepts/hangzhou-metro-line-15/versions.html</url>
  <entity>
    <perspectives></perspectives>
    <customFields>
      <field>
        <key>line_status</key>
        <value>Under construction (information from October 2026)</value>
      </field>
      <field>
        <key>line_structure</key>
        <value>Entire first phase underground</value>
      </field>
      <field>
        <key>line_termini</key>
        <value>Yatai Road station–Chongxian station</value>
      </field>
    </customFields>
    <rankingTiers></rankingTiers>
    <rankingColumns></rankingColumns>
    <rankingEntries></rankingEntries>
    <id>concept_hangzhou_metro_line_15</id>
    <type>concept</type>
    <title>Hangzhou Metro Line 15</title>
    <slug>hangzhou-metro-line-15</slug>
    <aliases></aliases>
    <previousSlugs></previousSlugs>
    <summary>The first phase of Hangzhou Metro Line 15 is an under-construction north–south underground line from Yatai Road station in Xiaoshan District to Chongxian station in Linping District. It is about 40.9 km long, with 30 stations, including 15 interchange stations. Reports in October 2026 cited a target of being ready for service by the end of 2027.</summary>
    <status>published</status>
    <categories>
      <category>category-transit</category>
      <category>category-urban-rail</category>
    </categories>
    <tags>
      <tag>tag-metro</tag>
      <tag>tag-metro-line</tag>
    </tags>
    <sources>
      <source>
        <id>project15-202608</id>
        <title>杭州政协网：杭淳开高速、杭州地铁四期等工程迎来新进展</title>
        <url>https://www.hzzx.gov.cn/cshz/content/2026-08/14/content_9280094.htm</url>
        <locator>2026年8月；15号线一期工程概况</locator>
      </source>
      <source>
        <id>plan-202610</id>
        <title>都市快报：杭州地铁12号线、15号线迎来关键进展</title>
        <url>https://mdaily.hangzhou.com.cn/dskb/2026/10/11/article_detail_2_20261011B021.html</url>
        <locator>2026年10月11日；工程信息与计划通车时间</locator>
      </source>
    </sources>
    <createdAt>2026-10-29T11:53:15+08:00</createdAt>
    <updatedAt>2026-10-31T00:34:25+08:00</updatedAt>
    <updatedBy>user:admin</updatedBy>
    <revision>29</revision>
    <body>## Route&#xA;&#xA;The first phase of Hangzhou Metro Line 15 runs from Yatai Road station in Xiaoshan District in the south to Chongxian station in Linping District in the north. The 40.9 km line is planned entirely underground, with 30 stations, 15 of them interchange stations. It crosses Xiaoshan, Shangcheng, Gongshu and Linping districts and passes through the Southern Residential City, old Xiaoshan, Qianjiang Century City, Jianghehui, Heping Square, Canal New City and Kangqiao areas.[^project15-202608][^plan-202610]&#xA;&#xA;## Construction progress&#xA;&#xA;From July to August 2026, shield-tunnelling work on the left tunnel between Xiaomian Road and Jinji Road stations moved into the launch stage. The section is 504 m long and follows Jinji Road from Xiaomian Road station to Jinji Road station. It passed the launch-readiness inspection on 30 July, and the shield machine began tunnelling on 3 August.[^project15-202608]&#xA;&#xA;In October 2026, a project connecting Shushan station with the Xiaoshan campus of the Second Affiliated Hospital of Zhejiang University School of Medicine entered the pre-approval public-notice stage. Two underground passages are planned: Passage A, about 30 m long, will connect to the hospital&#39;s basement level 1; Passage D, about 44 m long, will connect to the sunken plaza. Once built, passengers will be able to reach the hospital campus from Shushan station through the passages.[^plan-202610]&#xA;&#xA;## Construction target&#xA;&#xA;An October 2026 report cited the project target of being ready for service by the end of 2027.[^plan-202610]</body>
    <url>/concepts/hangzhou-metro-line-15.html</url>
    <lang>en</lang>
    <sourceLang>zh</sourceLang>
    <availableLangs>
      <lang>zh</lang>
      <lang>ar</lang>
      <lang>de</lang>
      <lang>en</lang>
      <lang>es</lang>
      <lang>fr</lang>
      <lang>hi</lang>
      <lang>id</lang>
      <lang>it</lang>
      <lang>ja</lang>
      <lang>ko</lang>
      <lang>ms</lang>
      <lang>nl</lang>
      <lang>pt</lang>
      <lang>ru</lang>
      <lang>th</lang>
      <lang>tr</lang>
      <lang>vi</lang>
      <lang>zh-hant</lang>
    </availableLangs>
    <occupations></occupations>
    <conceptKind>metro_line</conceptKind>
    <creators></creators>
    <relatedTerms></relatedTerms>
  </entity>
  <entities></entities>
  <tags></tags>
  <categories></categories>
  <relations></relations>
  <mentions></mentions>
  <toc></toc>
  <askCitations></askCitations>
  <history></history>
  <versions>
    <revision>
      <revision>29</revision>
      <updatedAt>2026-10-31T00:43:39+08:00</updatedAt>
      <message>当前版本</message>
      <hasSnapshot>true</hasSnapshot>
      <url>/en/concepts/hangzhou-metro-line-15/at/29.html</url>
    </revision>
  </versions>
  <relationGroups></relationGroups>
  <lang>en</lang>
  <availableLangs>
    <lang>zh</lang>
    <lang>ar</lang>
    <lang>de</lang>
    <lang>en</lang>
    <lang>es</lang>
    <lang>fr</lang>
    <lang>hi</lang>
    <lang>id</lang>
    <lang>it</lang>
    <lang>ja</lang>
    <lang>ko</lang>
    <lang>ms</lang>
    <lang>nl</lang>
    <lang>pt</lang>
    <lang>ru</lang>
    <lang>th</lang>
    <lang>tr</lang>
    <lang>vi</lang>
    <lang>zh-hant</lang>
  </availableLangs>
  <infoFields>
    <field>
      <key>concept_kind</key>
      <label>Concept kind</label>
      <value>Metro line</value>
    </field>
    <field>
      <key>line_termini</key>
      <label>Termini</label>
      <value>Yatai Road station–Chongxian station</value>
    </field>
    <field>
      <key>line_status</key>
      <label>Status</label>
      <value>Under construction (information from October 2026)</value>
    </field>
    <field>
      <key>line_structure</key>
      <label>Structure</label>
      <value>Entire first phase underground</value>
    </field>
  </infoFields>
  <pagination>
    <page>1</page>
    <pageSize>50</pageSize>
    <total>1</total>
    <pageCount>1</pageCount>
  </pagination>
  <relationCounts></relationCounts>
  <rankings></rankings>
  <rankingBadges></rankingBadges>
</page>