---
{
  "availableLangs": [
    "zh",
    "de",
    "en",
    "fr",
    "ja"
  ],
  "categories": [
    "category-transit",
    "category-history"
  ],
  "conceptKind": "rail_line",
  "createdAt": "2026-10-28T00:00:00+08:00",
  "customFields": [
    {
      "key": "line_termini",
      "value": "博多～鹿儿岛中央"
    },
    {
      "key": "line_opened",
      "value": "2004年3月13日"
    },
    {
      "key": "line_length",
      "value": "256.8km"
    },
    {
      "key": "line_stations",
      "value": "10"
    },
    {
      "key": "line_max_speed",
      "value": "260km/h"
    },
    {
      "key": "line_operator",
      "value": "Kyushu Railway (JR Kyushu)"
    },
    {
      "key": "line_depots",
      "value": "Kumamoto General Rolling Stock Depot"
    },
    {
      "key": "line_status",
      "value": "In operation"
    },
    {
      "key": "line_owner",
      "value": "Japan Railway Construction, Transport and Technology Agency (Shinkansen sections) / JR companies"
    },
    {
      "key": "line_last_extension",
      "value": "Extension: 2011-03-12"
    }
  ],
  "id": "concept_japan_shinkansen_kyushu",
  "lang": "en",
  "revision": 11,
  "slug": "jp-shinkansen-kyushu",
  "sources": [
    {
      "id": "ja-wiki",
      "locator": "日本語ウィキペディア・公式サイト, 2026-10-28確認",
      "title": "九州新幹線",
      "url": "https://ja.wikipedia.org/wiki/%E4%B9%9D%E5%B7%9E%E6%96%B0%E5%B9%B9%E7%B7%9A"
    }
  ],
  "status": "published",
  "summary": "Linking Hakata and Kagoshima-Chuo; completed in 2011, Tokyo-Kagoshima takes about seven hours.",
  "tags": [
    "tag-rail"
  ],
  "title": "Kyushu Shinkansen",
  "type": "concept",
  "updatedAt": "2026-10-28T00:00:00+08:00",
  "updatedBy": "user:admin"
}
---

# Kyushu Shinkansen

Linking Hakata and Kagoshima-Chuo; completed in 2011, Tokyo-Kagoshima takes about seven hours.

## Overview

The Kyushu Shinkansen connects Hakata and Kagoshima-Chuo over 256.8 km with 10 stations at up to 260 km/h. Through-running with the Tokaido and Sanyo Shinkansen brings Tokyo-Kagoshima to about seven hours.

## Line data

| Item | Detail |
|---|---|
| Section | Hakata - Kagoshima-Chuo |
| Length | 256.8 km |
| Stations | 10 |
| Max speed | 260 km/h |
| Opened | March 13, 2004 (Shin-Yatsushiro-Kagoshima-Chuo) |
| Operator | [Kyushu Railway (JR Kyushu)](/en/organizations/jp-jr-kyushu.html) |
| Rolling stock | N700S-8000, 800 series |

## Stations

Hakata, Shin-Tosu, Kurume, Chikugo-Funagoya, Shin-Omuta, Shin-Tamana, Kumamoto, Shin-Yatsushiro, Shin-Minamata and Kagoshima-Chuo.

更新时间：2026-10-28

## 标签


## 关系


第 1 / 1 页，共 1 条。

## 来源

- 九州新幹線：https://ja.wikipedia.org/wiki/%E4%B9%9D%E5%B7%9E%E6%96%B0%E5%B9%B9%E7%B7%9A 日本語ウィキペディア・公式サイト, 2026-10-28確認
