{
  "contentStorage": "postgres",
  "title": "Xi'an Metro Line 15 · Versions",
  "description": "Phase 1 of Xi'an Metro Line 15 connects Dongzhaoyu and Xiliu. It began initial operations on 28 December 2025, is about 19.5 km long with 13 stations, and connects with Lines 2, 4 and 6. Timetables effective 12 January 2026 are listed.",
  "url": "/en/concepts/xian-metro-line-15/versions.html",
  "entity": {
    "customFields": [
      {
        "key": "line_stations",
        "value": "13 (Phase 1)"
      },
      {
        "key": "line_termini",
        "value": "Dongzhaoyu station – Xiliu station (Phase 1)"
      },
      {
        "key": "line_opened",
        "value": "28 December 2025 (Phase 1)"
      }
    ],
    "id": "concept_xian_metro_line_15",
    "type": "concept",
    "title": "Xi'an Metro Line 15",
    "slug": "xian-metro-line-15",
    "summary": "Phase 1 of Xi'an Metro Line 15 connects Dongzhaoyu and Xiliu. It began initial operations on 28 December 2025, is about 19.5 km long with 13 stations, and connects with Lines 2, 4 and 6. Timetables effective 12 January 2026 are listed.",
    "status": "published",
    "categories": [
      "category-transit",
      "category-urban-rail"
    ],
    "tags": [
      "tag-metro",
      "tag-metro-line"
    ],
    "sources": [
      {
        "id": "xian-metro-timetable",
        "title": "西安地铁：15号线各站首末班车时间",
        "url": "https://www.xianrail.com/xamo/xamo/traintimetable/2026/1/12/2e7b4a9483524c18ae6908919d828ec1.png",
        "locator": "原图注明自2026年1月12日起实行；2026年10月29日直接读取。"
      },
      {
        "id": "crsc-opening",
        "title": "中国通号：西安地铁15号线一期工程开通初期运营",
        "date": "2025-12-30",
        "url": "https://www.crsc.cn/news/tsi_6447_15824_88381.html",
        "locator": "开通日期、线路长度、车站数量及换乘线路。"
      }
    ],
    "createdAt": "2026-10-30T09:51:53+08:00",
    "updatedAt": "2026-10-30T09:53:23+08:00",
    "updatedBy": "user:admin",
    "revision": 79,
    "body": "## Overview\n\nPhase 1 of Xi'an Metro Line 15 connects Dongzhaoyu and Xiliu. It began initial operations on 28 December 2025, is about 19.5 km long, has 13 stations, and provides transfers to Lines 2, 4 and 6.[^crsc-opening]\n\n## First and last trains from the terminals\n\nEffective 12 January 2026, first and last departures from the two terminals are:\n\n- Dongzhaoyu toward Xiliu: first train 06:15, last train 23:30; the last train arrives at Xiliu at 23:59.\n- Xiliu toward Dongzhaoyu: first train 06:00, last train 23:00; the last train arrives at Dongzhaoyu at 23:29.[^xian-metro-timetable]\n\n## First and last trains at each station\n\nThe station times below are effective from 12 January 2026. “Arrival” marks the time the train reaches the terminal.[^xian-metro-timetable]\n\n| Station | Toward Xiliu First | Toward Dongzhaoyu First | Toward Xiliu Last | Toward Dongzhaoyu Last |\n| --- | --- | --- | --- | --- |\n| [[place_xian_dongzhaoyu|Dongzhaoyu]] | 06:15 | 06:29 arrives | 23:30 | 23:29 arrives |\n| [[place_xian_dongchanganjie|Dong Chang'an Street]] | 06:17 | 06:27 | 23:32 | 23:27 |\n| [[place_xian_huangzipo|Huangzipo]] | 06:19 | 06:24 | 23:34 | 23:24 |\n| [[place_xian_hangtiancheng|Hangtiancheng]] | 06:22 | 06:21 | 23:37 | 23:21 |\n| [[place_xian_changanguangchang|Chang'an Square]] | 06:24 | 06:19 | 23:39 | 23:19 |\n| [[place_xian_youdiandaxue|Post and Telecommunications University]] | 06:27 | 06:16 | 23:42 | 23:16 |\n| [[place_xian_yinghuaguangchang|Cherry Blossom Square]] | 06:30 | 06:13 | 23:45 | 23:13 |\n| [[place_xian_guodu|Guodu]] | 06:33 | 06:11 | 23:48 | 23:11 |\n| [[place_xian_guoduxi|Guodu West]] | 06:35 | 06:08 | 23:50 | 23:08 |\n| [[place_xian_zhucun|Zhucun]] | 06:37 | 06:06 | 23:52 | 23:06 |\n| [[place_xian_zhucunxi|Zhucun West]] | 06:40 | 06:04 | 23:55 | 23:04 |\n| [[place_xian_fujunmiao|Fujun Temple]] | 06:42 | 06:02 | 23:57 | 23:02 |\n| [[place_xian_xiliu|Xiliu]] | 06:44 arrives | 06:00 | 23:59 arrives | 23:00 |",
    "url": "/concepts/xian-metro-line-15.html",
    "lang": "en",
    "sourceLang": "zh",
    "availableLangs": [
      "zh",
      "ar",
      "de",
      "en",
      "es",
      "fr",
      "hi",
      "id",
      "it",
      "ja",
      "ko",
      "ms",
      "nl",
      "pt",
      "ru",
      "th",
      "tr",
      "vi",
      "zh-hant"
    ],
    "conceptKind": "metro_line"
  },
  "entities": null,
  "versions": [
    {
      "revision": 79,
      "updatedAt": "2026-10-30T09:54:29+08:00",
      "message": "当前版本",
      "hasSnapshot": true,
      "url": "/en/concepts/xian-metro-line-15/at/79.html"
    }
  ],
  "lang": "en",
  "availableLangs": [
    "zh",
    "ar",
    "de",
    "en",
    "es",
    "fr",
    "hi",
    "id",
    "it",
    "ja",
    "ko",
    "ms",
    "nl",
    "pt",
    "ru",
    "th",
    "tr",
    "vi",
    "zh-hant"
  ],
  "infoFields": [
    {
      "key": "concept_kind",
      "label": "Concept kind",
      "value": "Metro line"
    },
    {
      "key": "line_termini",
      "label": "Termini",
      "value": "Dongzhaoyu station – Xiliu station (Phase 1)"
    },
    {
      "key": "line_opened",
      "label": "Opened",
      "value": "28 December 2025 (Phase 1)"
    },
    {
      "key": "line_stations",
      "label": "Stations",
      "value": "13 (Phase 1)"
    }
  ],
  "pagination": {
    "page": 1,
    "pageSize": 50,
    "total": 1,
    "pageCount": 1
  }
}