---
{
  "adminArea": "Niedersachsen, Deutschland",
  "availableLangs": [
    "zh",
    "en"
  ],
  "categories": [
    "category-transit"
  ],
  "coordinates": {
    "latitude": 52.3772,
    "longitude": 9.7417
  },
  "createdAt": "2026-10-28T00:00:00+08:00",
  "established": {
    "display": "1843",
    "precision": "year",
    "year": 1843
  },
  "id": "place_de_hannover_hbf",
  "lang": "en",
  "placeKind": "railway_station",
  "revision": 3,
  "slug": "de-hannover-hbf",
  "sources": [
    {
      "id": "wikipedia",
      "locator": "abgerufen 2026-10-28",
      "title": "Hannover Hauptbahnhof — Wikipedia",
      "url": "https://de.wikipedia.org/wiki/Hannover_Hauptbahnhof"
    }
  ],
  "status": "published",
  "summary": "Opened in 1843 (today's building 1879), Hanover Hauptbahnhof is a central crossing station with 12 platform tracks, around 280,000 travellers daily and 750 trains per day, and the hub of the Hanover S-Bahn.",
  "tags": [
    "tag-rail"
  ],
  "title": "Hanover Hauptbahnhof",
  "type": "place",
  "updatedAt": "2026-10-28T00:00:00+08:00",
  "updatedBy": "user:admin"
}
---

# Hanover Hauptbahnhof

Opened in 1843 (today's building 1879), Hanover Hauptbahnhof is a central crossing station with 12 platform tracks, around 280,000 travellers daily and 750 trains per day, and the hub of the Hanover S-Bahn.

## Overview

The first station on this site went into operation in 1843; today's station building was erected in 1879. The through station is one of 21 Preisklasse 1 stations and, with around 280,000 travellers daily, Deutsche Bahn's seventh-busiest long-distance station; in 2016 around 750 trains passed through daily.

## Services

- Long-distance rail: [ICE 10](/en/concepts/ice-10.html), [ICE 11](/en/concepts/ice-11.html), [ICE 25](/en/concepts/ice-25.html); plus further ICE and IC lines (among others ICE 20/22 to Frankfurt) and Nightjet
- S-Bahn: Central hub of the Hanover S-Bahn opened in 2000 for the Expo, with lines S1–S8
- Regional rail: Numerous RE and RB lines, among others to Wolfsburg, Braunschweig, Bremen and Norddeich

## Station layout

The station has six platforms with 12 platform tracks plus two continuous main tracks. North of the station, since 1975, lies the underground Stadtbahn station Hauptbahnhof with four tracks for the A and B lines of the Hanover Stadtbahn network.

更新时间：2026-10-28

## 标签

- [铁路](/en/tags/rail.html)

## 关系


## 来源

- Hannover Hauptbahnhof — Wikipedia：https://de.wikipedia.org/wiki/Hannover_Hauptbahnhof abgerufen 2026-10-28
