---
{
  "availableLangs": [
    "zh",
    "de",
    "en",
    "fr",
    "ja"
  ],
  "categories": [
    "category-transit",
    "category-history"
  ],
  "conceptKind": "rail_line",
  "createdAt": "2026-10-28T00:00:00+08:00",
  "customFields": [
    {
      "key": "line_termini",
      "value": "Fukushima - Shinjo (through from Tokyo)"
    },
    {
      "key": "line_opened",
      "value": "1992-07-01"
    },
    {
      "key": "line_length",
      "value": "148,6 km"
    },
    {
      "key": "line_stations",
      "value": "8"
    },
    {
      "key": "line_max_speed",
      "value": "130 km/h (section mini-shinkansen)"
    },
    {
      "key": "line_operator",
      "value": "JR East"
    },
    {
      "key": "line_depots",
      "value": "Centre du matériel roulant de Yamagata"
    },
    {
      "key": "line_status",
      "value": "En service"
    },
    {
      "key": "line_owner",
      "value": "Agence japonaise de construction ferroviaire (sections shinkansen) / sociétés JR"
    },
    {
      "key": "line_last_extension",
      "value": "Extension: 1999-12-04"
    }
  ],
  "id": "concept_japan_shinkansen_yamagata",
  "lang": "fr",
  "revision": 17,
  "slug": "jp-shinkansen-yamagata",
  "sources": [
    {
      "id": "ja-wiki",
      "locator": "日本語ウィキペディア・公式サイト, 2026-10-28確認",
      "title": "山形新幹線",
      "url": "https://ja.wikipedia.org/wiki/%E5%B1%B1%E5%BD%A2%E6%96%B0%E5%B9%B9%E7%B7%9A"
    }
  ],
  "status": "published",
  "summary": "Un mini-shinkansen reliant Fukushima à Shinjo ; Tokyo-Shinjo en environ quatre heures.",
  "tags": [
    "tag-rail"
  ],
  "title": "Shinkansen Yamagata",
  "type": "concept",
  "updatedAt": "2026-10-28T00:00:00+08:00",
  "updatedBy": "user:admin"
}
---

# Shinkansen Yamagata

Un mini-shinkansen reliant Fukushima à Shinjo ; Tokyo-Shinjo en environ quatre heures.

## Aperçu

Le shinkansen Yamagata relie Fukushima à Shinjo sur 148,6 km, circulant sur des voies classiques converties (ligne Ou) en continuité avec le shinkansen Tohoku ; Tokyo-Shinjo prend environ quatre heures.

## Données

| Élément | Détail |
|---|---|
| Section | Fukushima - Shinjo (services depuis Tokyo) |
| Longueur | 148,6 km |
| Gares | 8 |
| Vitesse max | 130 km/h (section mini-shinkansen) / 320 km/h (section Tohoku) |
| Ouverture | 1er juillet 1992 (Fukushima-Yamagata) |
| Exploitant | [JR East](/fr/organizations/jp-jr-east.html) |
| Matériel | Séries E3, E8 |

## Gares

Fukushima, Kaminoyama-Onsen, Yamagata, Tendo, Sakuranbo-Higashine, Murayama, Oishida et Shinjo ; Yamagata est la porte de la source thermale de Zao.

更新时间：2026-10-28

## 标签

- [铁路](/fr/tags/rail.html)

## 关系


## 正文反向链接

- [Divisions administratives et chemins de fer du Japon](/fr/concepts/japan-admin-rail-overview.html)
- [Fukushima](/fr/places/jp-pref-fukushima.html)
- [Miyagi](/fr/places/jp-pref-miyagi.html)
- [Yamagata](/fr/places/jp-pref-yamagata.html)

## 来源

- 山形新幹線：https://ja.wikipedia.org/wiki/%E5%B1%B1%E5%BD%A2%E6%96%B0%E5%B9%B9%E7%B7%9A 日本語ウィキペディア・公式サイト, 2026-10-28確認
