---
{
  "availableLangs": [
    "zh",
    "ar",
    "de",
    "en",
    "es",
    "fr",
    "hi",
    "id",
    "it",
    "ja",
    "ko",
    "ms",
    "nl",
    "pt",
    "ru",
    "th",
    "tr",
    "vi",
    "zh-hant"
  ],
  "categories": [
    "category-transit",
    "category-urban-rail"
  ],
  "conceptKind": "metro_line",
  "createdAt": "2026-10-30T09:52:26+08:00",
  "customFields": [
    {
      "key": "line_stations",
      "value": "13 (चरण 1)"
    },
    {
      "key": "line_termini",
      "value": "डोंगझाओयू स्टेशन – शील्यू स्टेशन (चरण 1)"
    },
    {
      "key": "line_opened",
      "value": "28 दिसंबर 2025 (चरण 1)"
    }
  ],
  "id": "concept_xian_metro_line_15",
  "lang": "hi",
  "revision": 79,
  "slug": "xian-metro-line-15",
  "sourceLang": "zh",
  "sources": [
    {
      "id": "xian-metro-timetable",
      "locator": "原图注明自2026年1月12日起实行；2026年10月29日直接读取。",
      "title": "西安地铁：15号线各站首末班车时间",
      "url": "https://www.xianrail.com/xamo/xamo/traintimetable/2026/1/12/2e7b4a9483524c18ae6908919d828ec1.png"
    },
    {
      "date": "2025-12-30",
      "id": "crsc-opening",
      "locator": "开通日期、线路长度、车站数量及换乘线路。",
      "title": "中国通号：西安地铁15号线一期工程开通初期运营",
      "url": "https://www.crsc.cn/news/tsi_6447_15824_88381.html"
    }
  ],
  "status": "published",
  "summary": "शीआन मेट्रो लाइन 15 का पहला चरण डोंगझाओयू और शील्यू को जोड़ता है। प्रारंभिक परिचालन 28 दिसंबर 2025 को शुरू हुआ; लाइन लगभग 19.5 किमी लंबी है, इसमें 13 स्टेशन हैं और लाइन 2, 4 तथा 6 से संपर्क मिलता है। समय-सारणी 12 जनवरी 2026 से लागू है।",
  "tags": [
    "tag-metro",
    "tag-metro-line"
  ],
  "title": "शीआन मेट्रो लाइन 15",
  "type": "concept",
  "updatedAt": "2026-10-30T09:53:59+08:00",
  "updatedBy": "user:admin"
}
---

# शीआन मेट्रो लाइन 15

शीआन मेट्रो लाइन 15 का पहला चरण डोंगझाओयू और शील्यू को जोड़ता है। प्रारंभिक परिचालन 28 दिसंबर 2025 को शुरू हुआ; लाइन लगभग 19.5 किमी लंबी है, इसमें 13 स्टेशन हैं और लाइन 2, 4 तथा 6 से संपर्क मिलता है। समय-सारणी 12 जनवरी 2026 से लागू है।

## अवलोकन

शीआन मेट्रो लाइन 15 का पहला चरण डोंगझाओयू और शील्यू को जोड़ता है। प्रारंभिक परिचालन 28 दिसंबर 2025 को शुरू हुआ; लाइन लगभग 19.5 किमी लंबी है, इसमें 13 स्टेशन हैं और लाइन 2, 4 तथा 6 से संपर्क मिलता है।[^crsc-opening]

## दोनों टर्मिनलों से पहली और अंतिम ट्रेन

12 जनवरी 2026 से दोनों टर्मिनलों से पहली और अंतिम ट्रेनें:

- डोंगझाओयू से शील्यू की ओर: पहली ट्रेन 06:15, अंतिम 23:30; अंतिम ट्रेन 23:59 पर शील्यू पहुँचती है।
- शील्यू से डोंगझाओयू की ओर: पहली ट्रेन 06:00, अंतिम 23:00; अंतिम ट्रेन 23:29 पर डोंगझाओयू पहुँचती है।[^xian-metro-timetable]

## प्रत्येक स्टेशन पर पहली और अंतिम ट्रेन

नीचे दिए गए स्टेशन समय 12 जनवरी 2026 से लागू हैं। “आगमन” टर्मिनल पर पहुँचने का समय दर्शाता है।[^xian-metro-timetable]

| स्टेशन | शील्यू की ओर पहली | डोंगझाओयू की ओर पहली | शील्यू की ओर अंतिम | डोंगझाओयू की ओर अंतिम |
| --- | --- | --- | --- | --- |
| [Dongzhaoyu](/hi/places/xian-dongzhaoyu.html) | 06:15 | 06:29 आगमन | 23:30 | 23:29 आगमन |
| [Dong Chang'an Street](/hi/places/xian-dongchanganjie.html) | 06:17 | 06:27 | 23:32 | 23:27 |
| [Huangzipo](/hi/places/xian-huangzipo.html) | 06:19 | 06:24 | 23:34 | 23:24 |
| [Hangtiancheng](/hi/places/xian-hangtiancheng.html) | 06:22 | 06:21 | 23:37 | 23:21 |
| [Chang'an Square](/hi/places/xian-changanguangchang.html) | 06:24 | 06:19 | 23:39 | 23:19 |
| [Post and Telecommunications University](/hi/places/xian-youdiandaxue.html) | 06:27 | 06:16 | 23:42 | 23:16 |
| [Cherry Blossom Square](/hi/places/xian-yinghuaguangchang.html) | 06:30 | 06:13 | 23:45 | 23:13 |
| [Guodu](/hi/places/xian-guodu.html) | 06:33 | 06:11 | 23:48 | 23:11 |
| [Guodu West](/hi/places/xian-guoduxi.html) | 06:35 | 06:08 | 23:50 | 23:08 |
| [Zhucun](/hi/places/xian-zhucun.html) | 06:37 | 06:06 | 23:52 | 23:06 |
| [Zhucun West](/hi/places/xian-zhucunxi.html) | 06:40 | 06:04 | 23:55 | 23:04 |
| [Fujun Temple](/hi/places/xian-fujunmiao.html) | 06:42 | 06:02 | 23:57 | 23:02 |
| [Xiliu](/hi/places/xian-xiliu.html) | 06:44 आगमन | 06:00 | 23:59 आगमन | 23:00 |

更新时间：2026-10-30

## 标签


## 关系

- Stops at：[长安广场站](/hi/places/xian-changanguangchang.html) 
- Stops at：[东长安街站](/hi/places/xian-dongchanganjie.html) 
- Stops at：[东兆余站](/hi/places/xian-dongzhaoyu.html) 
- Stops at：[府君庙站](/hi/places/xian-fujunmiao.html) 
- Stops at：[郭杜站](/hi/places/xian-guodu.html) 
- Stops at：[郭杜西站](/hi/places/xian-guoduxi.html) 
- Stops at：[航天城站](/hi/places/xian-hangtiancheng.html) 
- Stops at：[皇子坡站](/hi/places/xian-huangzipo.html) 
- Stops at：[细柳站](/hi/places/xian-xiliu.html) 
- Stops at：[樱花广场站](/hi/places/xian-yinghuaguangchang.html) 
- Stops at：[邮电大学站](/hi/places/xian-youdiandaxue.html) 
- Stops at：[祝村站](/hi/places/xian-zhucun.html) 
- Stops at：[祝村西站](/hi/places/xian-zhucunxi.html) 

第 1 / 1 页，共 13 条。

## 正文反向链接

- [长安广场站](/hi/places/xian-changanguangchang.html)
- [东长安街站](/hi/places/xian-dongchanganjie.html)
- [东兆余站](/hi/places/xian-dongzhaoyu.html)
- [府君庙站](/hi/places/xian-fujunmiao.html)
- [郭杜站](/hi/places/xian-guodu.html)
- [郭杜西站](/hi/places/xian-guoduxi.html)
- [航天城站](/hi/places/xian-hangtiancheng.html)
- [皇子坡站](/hi/places/xian-huangzipo.html)
- [细柳站](/hi/places/xian-xiliu.html)
- [樱花广场站](/hi/places/xian-yinghuaguangchang.html)

## 来源

- 西安地铁：15号线各站首末班车时间：https://www.xianrail.com/xamo/xamo/traintimetable/2026/1/12/2e7b4a9483524c18ae6908919d828ec1.png 原图注明自2026年1月12日起实行；2026年10月29日直接读取。
- 中国通号：西安地铁15号线一期工程开通初期运营：https://www.crsc.cn/news/tsi_6447_15824_88381.html 开通日期、线路长度、车站数量及换乘线路。
