---
{
  "aliases": [
    "Line 2 (Changchun Rail Transit)"
  ],
  "availableLangs": [
    "zh",
    "en"
  ],
  "categories": [
    "category-transit"
  ],
  "conceptKind": "metro_line",
  "createdAt": "2026-10-24",
  "customFields": [
    {
      "key": "line_opened",
      "value": "2018年8月30日"
    },
    {
      "key": "line_last_extension",
      "value": "2025年9月28日"
    },
    {
      "key": "line_length",
      "value": "34.7公里"
    },
    {
      "key": "line_stations",
      "value": "27"
    },
    {
      "key": "line_termini",
      "value": "汽车公园站—雾开河大街站"
    },
    {
      "key": "line_structure",
      "value": "地下"
    },
    {
      "key": "line_max_speed",
      "value": "80公里/小时"
    },
    {
      "key": "line_status",
      "value": "运营中"
    },
    {
      "key": "line_operator",
      "value": "长春轨道交通集团客运二中心"
    },
    {
      "key": "line_owner",
      "value": "长春轨道交通集团"
    },
    {
      "key": "line_depots",
      "value": "西湖车辆段（与6号线共用）、 莲花山停车场（与9号线共用）"
    },
    {
      "key": "line_rolling_stock",
      "value": "DKZ60、DKZ61型电客车"
    }
  ],
  "fallback": true,
  "id": "concept_changchun_metro_line_2",
  "lang": "ja",
  "revision": 2,
  "slug": "changchun-metro-line-2",
  "sources": [
    {
      "id": "cptond",
      "locator": "Changchun/changchun_metro_routes.shp; DBF rows 3,6; status=1",
      "title": "CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)",
      "url": "https://doi.org/10.6084/m9.figshare.29377427.v2"
    },
    {
      "id": "wikidata",
      "title": "Wikidata Q15913266",
      "url": "https://www.wikidata.org/wiki/Q15913266"
    },
    {
      "id": "zhwiki",
      "locator": "信息框",
      "title": "长春地铁2号线（维基百科）",
      "url": "https://zh.wikipedia.org/wiki/%E9%95%BF%E6%98%A5%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A2%E5%8F%B7%E7%BA%BF"
    },
    {
      "date": "2026-04-28",
      "id": "changchun-summer-2026",
      "locator": "文章标注来源长春发布、长春轨道交通；2026年4月30日至10月31日各线夏季首末班。",
      "title": "中国吉林网转载：长春轨道交通夏季运营时间",
      "url": "https://news.cnjiwang.com/jlxwdt/sn/202604/4042042.html"
    }
  ],
  "status": "published",
  "summary": "长春地铁2号线是一条地铁线路，2018年8月30日开通，最近一次延伸为2025年9月28日，全长34.7公里，设27座车站。",
  "tags": [
    "tag-metro"
  ],
  "title": "长春地铁2号线",
  "type": "concept",
  "updatedAt": "2026-10-27",
  "updatedBy": "user:admin"
}
---

# 长春地铁2号线

长春地铁2号线是一条地铁线路，2018年8月30日开通，最近一次延伸为2025年9月28日，全长34.7公里，设27座车站。

## 概况

长春地铁2号线是一条地铁线路，2018年8月30日开通[^zhwiki]，最近一次延伸为2025年9月28日[^zhwiki]，全长34.7公里[^zhwiki]，设27座车站[^zhwiki]。

## 车站

按线路顺序共27座车站[^wikidata]：

- [汽车公园站](/ja/places/changchun-qichegongyuan.html)
- [捷达大路站](/ja/places/changchun-jiedadalu.html)
- [西湖站](/ja/places/changchun-xihu.html)
- [双丰站](/ja/places/changchun-shuangfeng.html)
- 长春西站站
- [兴隆堡站](/ja/places/changchun-xinglongbao.html)
- [西环城路站](/ja/places/changchun-xihuanchenglu.html)
- [和平大街站](/ja/places/changchun-hepingdajie.html)
- [万福街站](/ja/places/changchun-wanfujie.html)
- [景阳广场站](/ja/places/changchun-jingyangguangchang.html)
- [解放桥站](/ja/places/changchun-jiefangqiao.html)
- [建设广场站](/ja/places/changchun-jiansheguangchang.html)
- [文化广场站](/ja/places/changchun-wenhuaguangchang.html)
- [解放大路站](/ja/places/changchun-jiefangdalu.html)
- [平阳街站](/ja/places/changchun-pingyangjie.html)
- [南关站](/ja/places/changchun-nanguan.html)
- [吉林大路站](/ja/places/changchun-jilindalu.html)
- [东盛大街站](/ja/places/changchun-dongshengdajie.html)
- [东环城路站](/ja/places/changchun-donghuanchenglu.html)
- [长青站](/ja/places/changchun-changqing.html)
- [东方广场站](/ja/places/changchun-dongfangguangchang.html)
- 哈尔滨大街站
- 窦家沟站
- 英俊大街站
- 英凯大街站
- 林溪大街站
- 雾开河大街站

## 营业时间与首末班车

中国吉林网转载、标注来源为长春轨道交通的2026年4月28日信息，公布了2026年4月30日至10月31日夏季首末班时间：[^changchun-summer-2026]

| 方向 | 首班 | 末班 |
| --- | --- | --- |
| 汽车公园至雾开河大街 | 05:15 | 22:35 |
| 雾开河大街至汽车公园 | 05:45 | 22:35 |

上述是公告列出的线路方向时刻，不是逐站双向表；如遇后续运行图或临时调整，以运营方公告为准。10月31日之后不能直接沿用该夏季时刻。

更新时间：2026-10-27

## 标签

- [地铁](/ja/tags/metro.html)

## 关系

- Stops at：[长春西站](/ja/places/changchun-changchunxi.html) 
- Stops at：[汽车公园站](/ja/places/changchun-qichegongyuan.html) 
- Stops at：[东盛大街站](/ja/places/changchun-dongshengdajie.html) 
- Stops at：[景阳广场站](/ja/places/changchun-jingyangguangchang.html) 
- Stops at：[文化广场站](/ja/places/changchun-wenhuaguangchang.html) 
- Stops at：[解放桥站](/ja/places/changchun-jiefangqiao.html) 
- Stops at：[东方广场站](/ja/places/changchun-dongfangguangchang.html) 
- Stops at：[解放大路站](/ja/places/changchun-jiefangdalu.html) 
- Stops at：[南关站](/ja/places/changchun-nanguan.html) 
- Stops at：[兴隆堡站](/ja/places/changchun-xinglongbao.html) 

## 正文反向链接

- [长春市](/ja/places/changchun.html)
- [长春西站](/ja/places/changchun-changchunxi.html)
- [长青站](/ja/places/changchun-changqing.html)
- [东方广场站](/ja/places/changchun-dongfangguangchang.html)
- [东环城路站](/ja/places/changchun-donghuanchenglu.html)
- [东盛大街站](/ja/places/changchun-dongshengdajie.html)
- [和平大街站](/ja/places/changchun-hepingdajie.html)
- [建设广场站](/ja/places/changchun-jiansheguangchang.html)
- [捷达大路站](/ja/places/changchun-jiedadalu.html)
- [解放大路站](/ja/places/changchun-jiefangdalu.html)

## 来源

- CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)：https://doi.org/10.6084/m9.figshare.29377427.v2 Changchun/changchun\_metro\_routes.shp; DBF rows 3,6; status=1
- Wikidata Q15913266：https://www.wikidata.org/wiki/Q15913266 
- 长春地铁2号线（维基百科）：https://zh.wikipedia.org/wiki/%E9%95%BF%E6%98%A5%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A2%E5%8F%B7%E7%BA%BF 信息框
- 中国吉林网转载：长春轨道交通夏季运营时间：https://news.cnjiwang.com/jlxwdt/sn/202604/4042042.html 文章标注来源长春发布、长春轨道交通；2026年4月30日至10月31日各线夏季首末班。
