---
{
  "availableLangs": [
    "zh"
  ],
  "categories": [
    "category-transit"
  ],
  "conceptKind": "other",
  "createdAt": "2026-10-31T13:33:10+08:00",
  "customFields": [
    {
      "key": "line_termini",
      "value": "Las Juntas ↔ Tlajomulco Centro"
    },
    {
      "key": "line_stations",
      "value": "8站"
    },
    {
      "key": "line_opened",
      "value": "2025年12月"
    },
    {
      "key": "line_operator",
      "value": "SITEUR"
    }
  ],
  "fallback": true,
  "id": "concept_siteur_line_4",
  "lang": "th",
  "revision": 1,
  "slug": "siteur-line-4",
  "sources": [
    {
      "id": "ewiki_1947113331",
      "locator": "English Wikipedia, accessed 2026-10-31",
      "title": "瓜达拉哈拉轻轨4号线 — Wikipedia",
      "url": "https://en.wikipedia.org/wiki/%E7%93%9C%E8%BE%BE%E6%8B%89%E5%93%88%E6%8B%89%E8%BD%BB%E8%BD%A84%E5%8F%B7%E7%BA%BF"
    }
  ],
  "status": "published",
  "summary": "4号线 2025 年 12 月开通，沿既有货运铁路走廊自 Las Juntas 南至 Tlajomulco Centro，全长 21.2 公里、8 站。",
  "tags": [
    "tag-metro"
  ],
  "title": "瓜达拉哈拉轻轨4号线",
  "type": "concept",
  "updatedAt": "2026-10-31T13:33:10+08:00",
  "updatedBy": "user:admin"
}
---

# 瓜达拉哈拉轻轨4号线

4号线 2025 年 12 月开通，沿既有货运铁路走廊自 Las Juntas 南至 Tlajomulco Centro，全长 21.2 公里、8 站。

## 概况

4号线 2025 年 12 月 15 日开通，沿既有铁路用地南延至 Tlajomulco，服务南部快速增长的近郊走廊，为通勤式轻轨（与 Mi Macro Calzada BRT 南端衔接）。

## 车站列表（北→南）

Las Juntas - Jalisco 200 Años - Real del Valle - Concepción del Valle - El Cuervo - Lomas del Sur - CUTLAJO - Tlajomulco Centro

更新时间：2026-10-31

## 标签

- [รถไฟฟ้าใต้ดิน](/th/tags/metro.html)

## 关系


## 来源

- 瓜达拉哈拉轻轨4号线 — Wikipedia：https://en.wikipedia.org/wiki/%E7%93%9C%E8%BE%BE%E6%8B%89%E5%93%88%E6%8B%89%E8%BD%BB%E8%BD%A84%E5%8F%B7%E7%BA%BF English Wikipedia, accessed 2026-10-31
