Concepts · concept_changchun_metro_line_2

Line 2 (Changchun Rail Transit)

Line 2 (Changchun Rail Transit) is a metro line, opened on 30 August 2018, 34.7 km long, with 27 stations.

Updated · rev 1 · Aliases:长春地铁2号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
长春地铁2号线
Opened
30 August 2018
Last extension
28 September 2025
Length
34.7 km
Stations
27
Termini
Qiche Gongyuan station – Wukaihe Dajie station
Structure
underground
Maximum speed
80 km/h
Status
In operation

Overview

Line 2 (Changchun Rail Transit) is a metro line, opened on 30 August 2018[3], 34.7 km long[3], with 27 stations[3].

Stations

27 stations in line order[2]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Changchun/changchun_metro_routes.shp; DBF rows 3,6; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Wikidata Q15913266 ↩
  3. 长春地铁2号线(维基百科)

    信息框

    ↩ ↩ ↩