Concepts · concept_changsha_metro_line_4

Line 4 (Changsha Metro)

Line 4 (Changsha Metro) is a metro line, opened on 26 May 2019, 33.5 km long, with 25 stations.

Updated · rev 1 · Aliases:长沙地铁4号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
长沙地铁4号线
Opened
26 May 2019
Length
33.5 km
Stations
25
Termini
Guanziling station – Dujiaping station
Structure
underground
Maximum speed
80 km/h
Status
In operation

Overview

Line 4 (Changsha Metro) is a metro line, opened on 26 May 2019[3], 33.5 km long[3], with 25 stations[3].

Stations

25 stations in line order[2]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Changsha/changsha_metro_routes.shp; DBF rows 2,19; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Wikidata Q24835582 ↩
  3. 长沙地铁4号线(维基百科)

    信息框

    ↩ ↩ ↩