Overview
The first phase of the Changsha–Zhuzhou–Xiangtan Intercity Rail West Ring Line runs north–south between Xiangtan North station and Dawangshan in Changsha. It opened on 28 June 2023, is 17.29 km long and has eight stations. It through-runs with Changsha Metro Line 3; the official account says Changsha and Xiangtan are connected in just over 20 minutes. [1]
Stations and structure
From south to north, the phase-one stations are Xiangtan North, Chuanshingshan, Huangjiawan, Shuanghu, Pingtang, Hongqiao, Tongxi and Dawangshan. Four stations are underground and four are elevated; the line has two interchange stations. The cited notice does not identify those two stations by name. [1]
Operations and intercity travel
The West Ring Line company entrusts operations to an operating company under Changsha Rail Transit Group. Through operation with Changsha Metro Line 3 provides an intercity rail option for Changsha and Xiangtan residents. Length, station configuration and travel-time statements here refer to phase one and its opening announcement; consult current operator information before travelling. [1]