Concepts · concept_chengdu_metro_line_10

Line 10 (Chengdu Metro)

Line 10 (Chengdu Metro) is a metro line, opened on 6 September 2017, 10.9 km long.

Updated · rev 1 · Aliases:成都地铁10号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
成都地铁10号线
Opened
6 September 2017
Last extension
17 September 2025
Length
10.9 km
Termini
People's Park station – Xinping station
Structure
underground, elevated
Maximum speed
100 km/h

Overview

Line 10 (Chengdu Metro) is a metro line, opened on 6 September 2017[2], 10.9 km long[2].

Stations

21 stations in line order[2]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Chengdu/chengdu_metro_routes.shp; DBF rows 19,29; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Wikidata Q11074644 ↩ ↩ ↩
  3. 成都地铁10号线(维基百科)

    信息框