Concepts · concept_chongqing_metro_line_18

Line 18 (Chongqing Rail Transit)

Line 18 (Chongqing Rail Transit) is a metro line, opened on 28 December 2023, with 19 stations.

Updated · rev 1 · Aliases:重庆地铁18号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
重庆地铁18号线
Opened
28 December 2023
Stations
19
Termini
Xiaoshizi station – Tiaodengnan station
Structure
underground, elevated
Status
In operation

Overview

Line 18 (Chongqing Rail Transit) is a metro line, opened on 28 December 2023[3], with 19 stations[3].

Stations

27 stations in line order[2]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Chongqing/chongqing_metro_routes.shp; DBF rows 11,12; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Wikidata Q17038985 ↩
  3. 重庆地铁18号线(维基百科)

    信息框

    ↩ ↩