Concepts · concept_guangzhou_metro_line_21 · rev 1

Line 21 (Guangzhou Metro)

Line 21 (Guangzhou Metro) is a metro line, opened on 28 December 2018, with 20 stations.

Updated · rev 1 · Aliases:广州地铁21号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
广州地铁21号线
Opened
28 December 2018
Last extension
20 December 2019
Stations
20
Termini
Tianhe Park station – Zengcheng Square Station
Status
In operation

Overview

Line 21 (Guangzhou Metro) is a metro line, opened on 28 December 2018[4], with 20 stations[4].

Stations

20 stations in line order[3]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Guangzhou/guangzhou_metro_routes.shp; DBF rows 28,33; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Guangzhou Metro — Wikipedia

    Operators / Operation and current lines table; operator identity review only, not station coverage. Retrieved 2026-10-24; CC BY-SA 4.0; original Chinese factual summary.

    ↩
  3. Wikidata Q6553110 ↩
  4. 广州地铁21号线(维基百科)

    信息框

    ↩ ↩