Concepts · concept_guangzhou_metro_line_7

Line 7 (Guangzhou Metro)

Line 7 (Guangzhou Metro) is a metro line, opened on 28 December 2016, 32.05 km long, with 28 stations.

Updated · rev 1 · Aliases:广州地铁7号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
广州地铁7号线
Opened
28 December 2016
Last extension
28 December 2023
Length
32.05 km
Stations
28
Termini
Yanshan station – Meidi Dadao station
Status
In operation

Overview

Line 7 (Guangzhou Metro) is a metro line, opened on 28 December 2016[4], 32.05 km long[3], with 28 stations[4].

Stations

27 stations in line order[3]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Guangzhou/guangzhou_metro_routes.shp; DBF rows 42,59; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Guangzhou Metro — Wikipedia

    Operators / Operation and current lines table; operator identity review only, not station coverage. Retrieved 2026-10-24; CC BY-SA 4.0; original Chinese factual summary.

    ↩
  3. Wikidata Q6553152 ↩ ↩
  4. 广州地铁7号线(维基百科)

    信息框

    ↩ ↩