Concepts · concept_hohhot_metro_line_1

Line 1 (Hohhot Metro)

Line 1 (Hohhot Metro) is a metro line, opened on 29 December 2019, 21.72 km long, with 20 stations.

Updated · rev 1 · Aliases:呼和浩特地铁1号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
呼和浩特地铁1号线
Opened
29 December 2019
Length
21.72 km
Stations
20
Termini
Yili Health Valley Station – Bayan (Airport) Station
Structure
underground, elevated, at grade
Maximum speed
80 km/h
Status
In operation

Overview

Line 1 (Hohhot Metro) is a metro line, opened on 29 December 2019[2], 21.72 km long[2], with 20 stations[3].

Stations

20 stations in line order[2]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Hohhot/hohhot_metro_routes.shp; DBF rows 2,3; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Wikidata Q76339003 ↩ ↩ ↩
  3. 呼和浩特地铁1号线(维基百科)

    信息框

    ↩