Hokkaido Shinkansen

Linking Shin-Aomori and Shin-Hakodate-Hokuto through the Seikan Tunnel since 2016; the Sapporo extension is under construction.

Updated · rev 11

# 铁路▣ 交通▣ 历史与文化

Profile

Concept kind
Rail line
Opened
2016年3月26日
Last extension
预计2030年度延伸至札幌
Length
148.8km
Stations
4
Termini
新青森~新函馆北斗
Maximum speed
260km/h
Status
In operation
Operator
Hokkaido Railway (JR Hokkaido)
Owner
Japan Railway Construction, Transport and Technology Agency (Shinkansen sections) / JR companies
Depots
Hakodate Shinkansen General Rolling Stock Depot

Overview

The Hokkaido Shinkansen connects Shin-Aomori and Shin-Hakodate-Hokuto over 148.8 km with 4 stations at up to 260 km/h. Through-running with the Tohoku Shinkansen, Tokyo-Shin-Hakodate-Hokuto takes about four hours.

Line data

ItemDetail
SectionShin-Aomori - Shin-Hakodate-Hokuto
Length148.8 km
Stations4
Max speed260 km/h (140 km/h in the Seikan Tunnel)
OpenedMarch 26, 2016
OperatorHokkaido Railway (JR Hokkaido)
Rolling stockE5, H5 series

Stations

Shin-Aomori, Okutsugaru-Imabetsu, Kikonai and Shin-Hakodate-Hokuto.