Concepts · concept_japan_shinkansen_kyushu

Kyushu Shinkansen

Linking Hakata and Kagoshima-Chuo; completed in 2011, Tokyo-Kagoshima takes about seven hours.

Updated · rev 11

# 铁路▣ 交通▣ 历史与文化

Profile

Concept kind
Rail line
Opened
2004年3月13日
Last extension
Extension: 2011-03-12
Length
256.8km
Stations
10
Termini
博多~鹿儿岛中央
Maximum speed
260km/h
Status
In operation
Operator
Kyushu Railway (JR Kyushu)
Owner
Japan Railway Construction, Transport and Technology Agency (Shinkansen sections) / JR companies
Depots
Kumamoto General Rolling Stock Depot

Overview

The Kyushu Shinkansen connects Hakata and Kagoshima-Chuo over 256.8 km with 10 stations at up to 260 km/h. Through-running with the Tokaido and Sanyo Shinkansen brings Tokyo-Kagoshima to about seven hours.

Line data

ItemDetail
SectionHakata - Kagoshima-Chuo
Length256.8 km
Stations10
Max speed260 km/h
OpenedMarch 13, 2004 (Shin-Yatsushiro-Kagoshima-Chuo)
OperatorKyushu Railway (JR Kyushu)
Rolling stockN700S-8000, 800 series

Stations

Hakata, Shin-Tosu, Kurume, Chikugo-Funagoya, Shin-Omuta, Shin-Tamana, Kumamoto, Shin-Yatsushiro, Shin-Minamata and Kagoshima-Chuo.

Continue via relations

Relations page →

Mentioned in

Sources

  1. 九州新幹線

    日本語ウィキペディア・公式サイト, 2026-10-28確認