Concepts · concept_japan_shinkansen_nishikyushu

Nishi-Kyushu Shinkansen

Linking Takeo-Onsen and Nagasaki since 2022, connecting with Hakata via the Nagasaki Main Line.

Updated · rev 11

# 铁路▣ 交通▣ 历史与文化

Profile

Concept kind
Rail line
Opened
2022年9月23日
Length
66.0km
Stations
5
Termini
武雄温泉~长崎
Maximum speed
260km/h
Status
In operation
Operator
Kyushu Railway (JR Kyushu)
Owner
Japan Railway Construction, Transport and Technology Agency (Shinkansen sections) / JR companies
Depots
Omura Rolling Stock Management Office

Overview

The Nishi-Kyushu Shinkansen connects Takeo-Onsen and Nagasaki over 66.0 km with 5 stations at up to 260 km/h. The Kamome service continues over the Nagasaki Main Line (a conventional limited express) to Hakata.

Line data

ItemDetail
SectionTakeo-Onsen - Nagasaki
Length66.0 km
Stations5
Max speed260 km/h
OpenedSeptember 23, 2022
OperatorKyushu Railway (JR Kyushu)
Rolling stockN700S-8000 series

Stations

Takeo-Onsen, Ureshino-Onsen, Shin-Omura, Isahaya and Nagasaki; Shin-Omura is nearest Nagasaki Airport and Ureshino-Onsen the gateway to its hot springs.

Continue via relations

Relations page →

Mentioned in

Sources

  1. 西九州新幹線

    日本語ウィキペディア・公式サイト, 2026-10-28確認