Concepts · concept_japan_shinkansen_yamagata

Yamagata Shinkansen

A Mini-Shinkansen linking Fukushima and Shinjo; Tokyo-Shinjo in about four hours.

Updated · rev 17

# 铁路▣ 交通▣ 历史与文化

Profile

Concept kind
Rail line
Opened
1992年7月1日
Last extension
Extension: 1999-12-04
Length
148.6km
Stations
8
Termini
福岛~新庄(东京~新庄直通)
Maximum speed
130 km/h (Mini-Shinkansen section)
Status
In operation
Operator
East Japan Railway (JR East)
Owner
Japan Railway Construction, Transport and Technology Agency (Shinkansen sections) / JR companies
Depots
Yamagata Rolling Stock Center

Overview

The Yamagata Shinkansen connects Fukushima and Shinjo over 148.6 km, running on regauged conventional tracks (Ou line) and through-running with the Tohoku Shinkansen; Tokyo-Shinjo takes about four hours.

Line data

ItemDetail
SectionFukushima - Shinjo (services from Tokyo)
Length148.6 km
Stations8
Max speed130 km/h (Mini-Shinkansen section) / 320 km/h (Tohoku Shinkansen section)
OpenedJuly 1, 1992 (Fukushima-Yamagata)
OperatorEast Japan Railway (JR East)
Rolling stockE3, E8 series

Stations

Fukushima, Kaminoyama-Onsen, Yamagata, Tendo, Sakuranbo-Higashine, Murayama, Oishida and Shinjo; Yamagata is the gateway to Zao Onsen.

Continue via relations

Relations page →

Mentioned in

Sources

  1. 山形新幹線

    日本語ウィキペディア・公式サイト, 2026-10-28確認