Concepts · concept_nantong_metro_line_1

Line 1 (Nantong Rail Transit) · Relations

Line 1 (Nantong Rail Transit) is a metro line, opened on 10 November 2022, 39.18 km long, with 28 stations.

同线路车站 · Line 1 (Nantong Rail Transit)

Stops at

Relations

28 entries

Mentioned in