Concepts · concept_paris_metro_l10

Paris Metro Line 10

Paris Metro Line 10 connects Boulogne–Pont de Saint-Cloud with Paris Austerlitz station, passing through the Latin Quarter.

Updated · rev 7

# 地铁▣ 交通

Profile

Concept kind
Metro line
Opened
December 30, 1923
Length
11.7 kilometers
Termini
Boulogne–Pont de Saint-Cloud ↔ Gare d'Austerlitz
Structure
Underground
Maximum speed
70 kilometers per hour
Status
In operation
Operator
RATP
Owner
RATP
Rolling stock
MF67

Overview

Line 10 opened in 1923, serving the southwest of Paris and the Latin Quarter; due to the line restructuring in 1930–1931, its route is relatively circuitous[wiki?].

Main Station

Boulogne–Pont de Saint-Cloud, Porte de Saint-Cloud, La Motte-Picquet–Grenelle, Sèvres–Babylone, Odéon, Cluny–La Sorbonne (Sorbonne University), Jussieu, Paris Austerlitz Station.

Operation

Continue via relations

Relations page →

Mentioned in

Sources

  1. Ligne 10 du métro de Paris — Wikipédia
  2. RATP Group — RATP en Île-de-France ↩