U3 (Nuremberg U-Bahn)

The U3 is the youngest line of the Nuremberg U-Bahn at 9.2 km with 14 stations; it opened on 14 June 2008 as Germany's first fully automatic U-Bahn and runs from Nordwestring to Großreuth bei Schweinau.

Updated · rev 35

Overview

Line U3 is the youngest and shortest line of the Nuremberg U-Bahn. It is 9.2 kilometres long and serves 14 stations. The line runs in a horseshoe-shaped alignment from Nordwestring via the city centre to Großreuth bei Schweinau. It was opened on 14 June 2008 as the first fully automatic, driverless U-Bahn in Germany. Between Rathenauplatz and Rothenburger Straße, the U3 shares the tracks of the U2. The line has been extended several times: in 2011 and 2017 at the northern end (as far as Nordwestring) and on 15 October 2020 on the southern side to Großreuth bei Schweinau; further extensions towards Kleinreuth and Gebersdorf are under construction.

Operator

The operator is VAG Nuremberg.

History

The U3 entered service on 14 June 2008 and was the first U-Bahn in Germany to operate permanently without drivers (from 15 March 2008). The northern branch was extended to Friedrich-Ebert-Platz in 2011 and in May 2017 to Nordwestring. On 15 October 2020 the southern branch reached its new terminus at Großreuth bei Schweinau; a further extension towards Kleinreuth and Gebersdorf is under construction.

Stations

Stations in operating direction (from Nordwestring to Großreuth bei Schweinau):

  • Nordwestring
  • Klinikum Nord
  • Friedrich-Ebert-Platz
  • Kaulbachplatz
  • Maxfeld
  • Rathenauplatz
  • Wöhrder Wiese
  • Nürnberg Hauptbahnhof
  • Opernhaus
  • Plärrer
  • Rothenburger Straße
  • Sündersbühl
  • Gustav-Adolf-Straße
  • Großreuth bei Schweinau

Continue via relations

Relations page →

  • No published relations.

Mentioned in

  • No body mentions yet.

Sources

  1. U-Bahn-Linie U3 (Nürnberg) — Wikipedia

    Abschnitte Verlauf und Stationen; abgerufen 2026-10-28