Concepts · concept_xuzhou_metro_line_1

Line 1 (Xuzhou Metro)

Line 1 (Xuzhou Metro) is a metro line, opened on 28 September 2019, with 18 stations.

Updated · rev 1 · Aliases:徐州地铁1号线

# 地铁▣ 交通

Profile

Concept kind
Metro line
Aliases
徐州地铁1号线
Opened
28 September 2019
Stations
18
Termini
Luwo Station – Xuzhoudong Railway Station
Status
In operation

Overview

Line 1 (Xuzhou Metro) is a metro line, opened on 28 September 2019[3], with 18 stations[3].

Stations

18 stations in line order[2]:

Continue via relations

Relations page →

Mentioned in

Sources

  1. CPTOND-2025 — Wang, Liang 等 (CC BY 4.0)

    Xuzhou/xuzhou_metro_routes.shp; DBF rows 2,6; status=1

    ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩ ↩
  2. Wikidata Q47004909 ↩
  3. 徐州地铁1号线(维基百科)

    信息框

    ↩ ↩