Phase II of the Tuanjiu project links the Tuancheng Lake regulating pond with the No. 9 waterworks supply system. The section runs from the ring main outlet of the pond to the phase II control gate at the Longbeicun gate station, about 4 kilometres in total.
Works
A 2026 procurement survey lists a water conveyance tunnel, the East-to-West transfer outlet, the Tuanbei intake gate station and air-release and drainage facilities along the route; the tunnel has an internal diameter of 4.7 metres and conveys water under gravity pressure. Design maximum flow is 28.3 cubic metres per second forward and 18.3 in reverse.[2]