Phase II of the Tuanjiu project

A Beijing component of the South-to-North Water Diversion linking the Tuancheng Lake regulating pond with the No. 9 waterworks supply system.

Updated · rev 8

Phase II of the Tuanjiu project links the Tuancheng Lake regulating pond with the No. 9 waterworks supply system. The section runs from the ring main outlet of the pond to the phase II control gate at the Longbeicun gate station, about 4 kilometres in total.

Works

A 2026 procurement survey lists a water conveyance tunnel, the East-to-West transfer outlet, the Tuanbei intake gate station and air-release and drainage facilities along the route; the tunnel has an internal diameter of 4.7 metres and conveys water under gravity pressure. Design maximum flow is 28.3 cubic metres per second forward and 18.3 in reverse.[2]

Continue via relations

Relations page →

Mentioned in

  • No body mentions yet.

Sources

  1. 北京市南水北调团城湖管理处巡查值守项目-团城湖调节池工程、团九二期工程以及东水西调工程巡查值守项目公开招标公告 · 北京市水务局网站(正文未署名) · 2026-10-20 ↩
  2. 北京市南水北调团城湖管理处水利工程日常维修养护费-设备维修养护采购需求调查公告 · 北京市水务局 · 2026-05-09 ↩