Traduzione non disponibile; viene mostrato il testo originale. Testo originale: 简体中文

Opere · work_ieee_p3150_d7_5_feb_2025

交联聚乙烯绝缘交流电力电缆中半导电阻水带试验IEEE已批准草案指南(IEEE Std P3150/D7.5, Feb 2025)

交联聚乙烯绝缘交流电力电缆中半导电阻水带试验IEEE已批准草案指南(IEEE Std P3150/D7.5, Feb 2025) 是电气电子工程师学会的草案,公开目录标为非现行(Inactive),著录年份为 2025 年。

Aggiornato · rev 2 · Altri nomi:P3150/D7.5, Feb 2025 P3150/D7.5, Feb 2025 - IEEE Approved Draft Guide for Testing the Semi-Conductive Water Blocking Tape in Cross-Linked Polyethylene Insulated Alternating-Current Power Cables IEEE Std P3150/D7.5, Feb 2025

交联聚乙烯绝缘交流电力电缆中半导电阻水带试验IEEE已批准草案指南(IEEE Std P3150/D7.5, Feb 2025)(IEEE Approved Draft Guide for Testing the Semi-Conductive Water Blocking Tape in Cross-Linked Polyethylene Insulated Alternating-Current Power Cables)是电气电子工程师学会于 2025 年 2 月形成的草案。公开目录将其标为非现行(Inactive),主题领域包括 Engineered Materials, Dielectrics and Plasmas、Power, Energy and Industry Applications[1]。参见IEEE 标准。

Esplora le relazioni

Pagina relazioni →

Mentioned in

  • No body mentions yet.

Fonti

  1. IEEE Std P3150/D7.5, Feb 2025 — IEEE Xplore 题录 · IEEE

    standard_number=P3150/D7.5, Feb 2025; status=Inactive; modifier=Draft

    ↩ ↩ ↩
  2. IEEE Xplore All Standards(KBART) · IEEE · 2026-11-01