Concepts · concept_japan_shinkansen_akita

Akita Shinkansen

A Mini-Shinkansen linking Morioka and Akita; Tokyo-Akita in about 3 hours 50 minutes.

Updated · rev 11

# 铁路▣ 交通▣ 历史与文化

Profile

Concept kind
Rail line
Opened
1997年3月22日
Length
127.3km
Stations
7
Termini
盛冈~秋田(东京~秋田直通)
Maximum speed
130 km/h (Mini-Shinkansen section)
Status
In operation
Operator
East Japan Railway (JR East)
Owner
Japan Railway Construction, Transport and Technology Agency (Shinkansen sections) / JR companies
Depots
Akita Rolling Stock Center

Overview

The Akita Shinkansen connects Morioka and Akita over 127.3 km, running on regauged conventional tracks (Tazawako and Ou lines) and through-running with the Tohoku Shinkansen; Tokyo-Akita takes about 3 hours 50 minutes.

Line data

ItemDetail
SectionMorioka - Akita (services from Tokyo)
Length127.3 km
Stations7
Max speed130 km/h (Mini-Shinkansen section) / 320 km/h (Tohoku Shinkansen section)
OpenedMarch 22, 1997
OperatorEast Japan Railway (JR East)
Rolling stockE6 series

Stations

Morioka, Iwate-Numakunai, Shizukuishi, Tazawako, Kakunodate, Omagari and Akita; Kakunodate is the gateway to the 'Little Kyoto of Michinoku'.

Continue via relations

Relations page →

Mentioned in

Sources

  1. 秋田新幹線

    日本語ウィキペディア・公式サイト, 2026-10-28確認