Concepts · concept_japan_shinkansen_sanyo

Sanyo Shinkansen

Linking Shin-Osaka and Hakata, through-running with the Tokaido Shinkansen at up to 300 km/h.

Updated · rev 11

# 铁路▣ 交通▣ 历史与文化

Profile

Concept kind
Rail line
Opened
1972年3月15日
Last extension
Extension: 1975-03-10
Length
553.7km
Stations
19
Termini
Shin-Osaka - Hakata
Maximum speed
300km/h
Status
In operation
Operator
West Japan Railway (JR West)
Owner
Japan Railway Construction, Transport and Technology Agency (Shinkansen sections) / JR companies
Depots
Hakata General Depot, Okayama Depot

Overview

The Sanyo Shinkansen connects Shin-Osaka and Hakata over 553.7 km with 19 stations and a top speed of 300 km/h. Through-running with the Tokaido Shinkansen, Nozomi trains cover Tokyo-Hakata in about four and a half hours.

Line data

ItemDetail
SectionShin-Osaka - Hakata
Length553.7 km
Stations19
Max speed300 km/h
OpenedMarch 15, 1972 (Shin-Osaka-Okayama); March 10, 1975 (Okayama-Hakata)
OperatorWest Japan Railway (JR West)
Rolling stock500, 700, N700, N700S series

Stations

Shin-Osaka, Shin-Kobe, Nishi-Akashi, Himeji, Aioi, Okayama, Shin-Kurashiki, Fukuyama, Shin-Onomichi, Mihara, Higashi-Hiroshima, Hiroshima, Shin-Iwakuni, Tokuyama, Shin-Yamaguchi, Asa, Shin-Shimonoseki, Kokura and Hakata.

Continue via relations

Relations page →

Mentioned in

Sources

  1. 山陽新幹線

    日本語ウィキペディア・公式サイト, 2026-10-28確認