Overview
Line 11 was opened in 1935 between Châtelet and Porte des Lilas, and in 1956 it became the first line to use rubber-tired trains. In June 2024, it was extended east to Rosny–Bois-Perrier, in preparation for the Grand Paris Express connection.
Main Station
Châtelet, Hôtel de Ville, Arts et Métiers, République, Belleville, Porte des Lilas, Mairie des Lilas, Rosny–Bois-Perrier.
Operation
- Operator: RATP[2]
- Vehicle: MP14 (rubber-tired)
- Service hours: approximately 5:30–1:15 the next day